Dongguan Shenghua Plastic Mould Factory
|
Gold Index: 11717
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Clear ABS Plastic Enclosures Custom Injection Mold - 3 Plate Mould
Part Name | Top+Base |
Injection Material | Clear ABS |
Number of Cavity | 1+1 |
Insert Steel | NAK80 Pre-Hardened 38~40HRC |
Slider Steel | S136 Hardened 45~48HRC |
Injection System | Cold Injection + Runner + Pin Point Gate |
Ejection Method | Ejector Pins |
Surface Treatment | Fine EDM Texture + High Polish |
T1 Lead Time | 40 Days |
Mold Turnaround Time | 60 Days |
Shipping Method | Via Ocean |
Mold Life Warranty: | 1 Million Shots |
Export To Country: | US |
Plastic Enclosures Injection Mold, Plastic Enclosures Tool, China Plastic Enclosures Injection Mould Maker, Dongguan Custom Injection Mold Maker, China Plastic Enclosures Tool Maker, China Custom Injection Molding, China Plastic product Development, China Plastic Product Manufacturer
Type of Molds We Build
The mass production molds we have built and shipped include:
All the moulds we build for export are according to DME or HASCO standards per customers requirements.
Hot Runner Systems We Use
We mainly use YUDO, MOLDMASTER, MASTERTIP and HUSKY according to customers requirements.
Mold Insert Steels We Use
The mold steels we mostly use include P20, 718/738H, NAK80, 2344, 2316, H13 and S136. These steels can be both imported or China made, depending on customers requirements and budget.
Mold Surface Treatment
It can be high polish, mirror polish, SPI standards. Different textures can be made, either according to MT Textures or texture reference customers supply.
Softwares We Use
Our engineers and designers are using AutoCAD (2D Modeling), Pro/E (3D Modeling), Solidworks (3D Modeling), MasterCAM (CNC Programming), Moldflow (Mould Flow Analysis). We accept product files with PDF, DXF, DWG, IGS, STP, X_T and SLDPRT extensions.
Main QC Procedures We Follow
Where to Test Moulds
For all the molds that can be mounted on 450 ton JSW injection machine, they will be tested in house. For all the moulds that need to be tested with the machine above 450 ton, they shall be tested in the professional mold test shops close to our factory, which is about 20 minutes drive away.
If you have a new mould that need to be built, or intend to build another mold for one of your existing parts, please send us an email to: shenghuamould[at]gmail.com with your requirements and specifications for the mould.
If you would like to see automatic running videos of the molds that we built before for reference, please specify the mold for a specific product you would like to see by email so that we can go over our data bank and get back to you with a video for the similar product mold we made.
Followings are the Main Reasons Why We’re Capable of Building Quality Molds for You:
Dongguan Shenghua Plastic Mould Factory [China (Mainland)]
Business Type:Manufacturer
City: Dongguan
Province/State: Guangdong
Country/Region: China (Mainland)